Home
Login Register
Vard   

Vard Holdings

 Post Reply 541-560 of 2469
 
WanSiTong
    12-Aug-2013 17:06  
Contact    Quote!


Finally last done : 0.885.

Shortists last minute cover !!?
 
 
eaton1977
    12-Aug-2013 16:15  
Contact    Quote!
Good luck and cheong above 1

ozone2002      ( Date: 12-Aug-2013 14:06) Posted:



targetting gap closure @ 99.5c

gd luck dyodd

ozone2002      ( Date: 12-Aug-2013 09:03) Posted:



86 c .. a gd start..

gap closure coming soon..

gd luck dyod


 
 
starlene
    12-Aug-2013 14:47  
Contact    Quote!


Hope the worst is over for VARD and now resume its climb again..

  Vard Holdings Ltd | PDF 
Brazilian coup 
VARD SP / VARD.SI | NEUTRAL - Maintained | S$0.84 - Tgt. S$0.91 
Mkt.Cap: US$783.20m | Avg.Daily Vol: US$5.87m | Free Float: 44.40% 
Offshore & Marine | Author(s): Zhi Bin YEO, 

▊ After some waiting, Vard has finally secured a blockbuster order for four pipelay support vessels worth NOk6.5bn or US$1.1bn,  representing its largest win ever.Factoring this in, we raise our FY13-15 EPS by 3-7%. Our target price, still at 9x CY14 P/E (mean since IPO), rises on our EPS upgrade. However, until investors are fully convinced that execution hiccups in Brazil are fully over, we think a sustained re-rating is unlikely. Hence, our unchanged Neutral rating. 

What Happened 
Vard has secured an order for four pipelay support vessels (PLSVs) worth NOK6.5bn (US$1.1bn) from the DOF Subsea-Technip JV. Once constructed, these vessels will be chartered out to Petrobras. Two of the vessels, of the VARD 3 05 design, will be delivered from Vard's European operations in 2Q16 and 3Q16 respectively. Another two, of the VARD 3 16 design, will be delivered from Vard Promar in 4Q16 and 2Q17 respectively. The VARD 3 05 vessel will be larger with higher specs. It will measure 151m in length and 30m in breadth, and will carry pipelay towers rated at 650 tonnes. The Brazilian-built VARD 3 05 vessel will measure 139.9m in length and 28m in breadth, and will have 340-tonne capacity. 

What We Think 
Vard has clinched NOK10.5bn of orders YTD, meeting our target of NOK11bn for the year. We now raise our target to NOK14bn. Owing to fierce competition, we believe margins for the four vessels could be on the lower side, though not diluting the group?s blended profitability too much. We retain our EBITDA-margin expectations of 8% for FY14 and 9% for FY15.Vard has a longstanding relationship with DOF-Technip and is the first and only yard to have successfully delivered two Brazilian-built PLSVs. We think the win demonstrates that Norwegian yards still have a competitive edge in high-end offshore production. Given its recent execution hiccups in Brazil, we are also comforted that the Brazilian-built vessels will have a longer delivery lead time. 

What You Should Do 


Stay Neutral on a 12-month horizon. We would revisit the stock on stronger orders and earnings. 

krisluke      ( Date: 12-Aug-2013 12:30) Posted:

VARD Bags Contracts for Four Pipelayers

Posted on Aug 12th, 2013

VARD Bags Contract for Four Pipelayers

Vard Holdings Limited (?VARD?) has secured contracts with joint ventures of DOF Subsea and Technip for the design and construction of four Pipe Lay Support Vessels (PLSVs).




The contracts constitute the largest order in VARD?s history, with an aggregate order value of approximately USD 1.1 billion (NOK 6.5 billion).

Two of the vessels, of VARD 3 05 design, will be delivered in 2Q 2016 and 3Q 2016 respectively. The hulls of these vessels will be built at Vard Tulcea in Romania and outfitted at Vard Søviknes in Norway. The other two vessels, of VARD 3 16 design, will be delivered from Vard Promar in Brazil, in 4Q 2016 and 2Q 2017 respectively.

The award of these prestigious contracts reinforces VARD?s position as a leading provider of large and complex Offshore Subsea Construction Vessels (OSCVs). Through this order, VARD is able to capitalize on its track record, experience and world‐ class design capabilities in Norway as well as its long‐ standing presence and investments in the Brazilian market.

The new designs have been developed in close cooperation with DOF and Technip. The Norwegian built vessels will carry pipe lay towers rated at 650 tons, among the largest ever in the industry. At 340 tons, the Brazilian built vessels will be among the most  complex vessels ever constructed in Brazil. Topside equipment for all four ships will be delivered by Huisman of the Netherlands.

CEO and Executive Director Roy Reite commented, ?I look forward to working with DOF and Technip on these milestone  projects. VARD yards in both Europe and Brazil being chosen to build these vessels illustrates the value of having a global  presence when working with international clients, and bringing leading edge technology to new markets.?

 

 
eaton1977
    12-Aug-2013 14:15  
Contact    Quote!
Good luck and cheong above 1

ozone2002      ( Date: 12-Aug-2013 14:06) Posted:



targetting gap closure @ 99.5c

gd luck dyodd

ozone2002      ( Date: 12-Aug-2013 09:03) Posted:



86 c .. a gd start..

gap closure coming soon..

gd luck dyod


 
 
serialain
    12-Aug-2013 14:15  
Contact    Quote!
Great volume so far!
 
 
ozone2002
    12-Aug-2013 14:06  
Contact    Quote!


targetting gap closure @ 99.5c

gd luck dyodd

ozone2002      ( Date: 12-Aug-2013 09:03) Posted:



86 c .. a gd start..

gap closure coming soon..

gd luck dyodd

ozone2002      ( Date: 11-Aug-2013 16:16) Posted:



Vard broke from its downtrend and  had a reversal on 30 Jul

recovering from low 77c to  a high of 83c on that day

Vard  likely to close the gap of 99.5c, time being support is @ 83c

cut loss point  80c .. depending on your loss  tolerance level

Gd luck DYODD 


 

 
GorgeousOng
    12-Aug-2013 13:46  
Contact    Quote!
Scary mouse are dancing now!!!
 
 
halleluyah
    12-Aug-2013 12:52  
Contact    Quote!
Hidding their face aredi....lol.

warrenbegger      ( Date: 12-Aug-2013 11:58) Posted:



Those like to talk rubbish one where r they now?

They only know how to talk rubbish and after that hide and change nick again  when they r wrong...

-Grazt to those that vest at low bottom, cheers :)

 
 
NoMoney
    12-Aug-2013 12:47  
Contact    Quote!
haha that's y I don't like to change Nick.. stay with the same Nick till I forget the password

warrenbegger      ( Date: 12-Aug-2013 11:58) Posted:



Those like to talk rubbish one where r they now?

They only know how to talk rubbish and after that hide and change nick again  when they r wrong...

-Grazt to those that vest at low bottom, cheers :)

 
 
krisluke
    12-Aug-2013 12:30  
Contact    Quote!

VARD Bags Contracts for Four Pipelayers

Posted on Aug 12th, 2013

VARD Bags Contract for Four Pipelayers

Vard Holdings Limited (?VARD?) has secured contracts with joint ventures of DOF Subsea and Technip for the design and construction of four Pipe Lay Support Vessels (PLSVs).




The contracts constitute the largest order in VARD?s history, with an aggregate order value of approximately USD 1.1 billion (NOK 6.5 billion).

Two of the vessels, of VARD 3 05 design, will be delivered in 2Q 2016 and 3Q 2016 respectively. The hulls of these vessels will be built at Vard Tulcea in Romania and outfitted at Vard Søviknes in Norway. The other two vessels, of VARD 3 16 design, will be delivered from Vard Promar in Brazil, in 4Q 2016 and 2Q 2017 respectively.

The award of these prestigious contracts reinforces VARD?s position as a leading provider of large and complex Offshore Subsea Construction Vessels (OSCVs). Through this order, VARD is able to capitalize on its track record, experience and world‐ class design capabilities in Norway as well as its long‐ standing presence and investments in the Brazilian market.

The new designs have been developed in close cooperation with DOF and Technip. The Norwegian built vessels will carry pipe lay towers rated at 650 tons, among the largest ever in the industry. At 340 tons, the Brazilian built vessels will be among the most  complex vessels ever constructed in Brazil. Topside equipment for all four ships will be delivered by Huisman of the Netherlands.

CEO and Executive Director Roy Reite commented, ?I look forward to working with DOF and Technip on these milestone  projects. VARD yards in both Europe and Brazil being chosen to build these vessels illustrates the value of having a global  presence when working with international clients, and bringing leading edge technology to new markets.?
 

 
krisluke
    12-Aug-2013 12:27  
Contact    Quote!


Vard Holdings Limited -

Morgan Stanley sold 1,410,000 shares as of 6 Aug

[last 57,679,000 or 4.8881%]
 
 
krisluke
    12-Aug-2013 12:25  
Contact    Quote!


Vard:

Secured an aggregate of NOK 6.5b worth of contracts in a JV agreement with DOF Subsea and Technip for the design and construction of four pipe lay support vessels.

The four vessels will have an expected delivery between 2Q16 and 2Q17.

This is compared to NOK 4b worth of orders secured year-to-date, and will bring order book to ~NOK20.5b.

Two vessels of VARD 3 05 design will be built at its Romania yard, Vard Tulcea, and outfitted at Vard Soviknes, Norway.

The expected delivery will be in 2Q16 and 3Q16.

The other two vessels of VARD 3 16 design will be built at Vard Promar, Brazil, with an expected delivery in 4Q16 and 2Q17.

Vard currently trades at 8x forward P/E and 1.4x P/B.
 
 
krisluke
    12-Aug-2013 12:22  
Contact    Quote!
After some waiting, Vard has finally secured a blockbuster order for four pipelay support vessels worth NOk6.5bn or US$1.1bn, representing its largest win ever.

Factoring this in, we raise our FY13-15 EPS by 3-7%. Our target price, still at 9x CY14 P/E (mean since IPO), rises on our EPS upgrade. However, until investors are fully convinced that execution hiccups in Brazil are fully over, we think a sustained re-rating is unlikely. Hence, our unchanged Neutral rating.

What Happened
Vard has secured an order for four pipelay support vessels (PLSVs) worth NOK6.5bn (US$1.1bn) from the DOF Subsea-Technip JV. Once constructed, these vessels will be chartered out to Petrobras. Two of the vessels, of the VARD 3 05 design, will be delivered from Vard's European operations in 2Q16 and 3Q16 respectively. Another two, of the VARD 3 16 design, will be delivered from Vard Promar in 4Q16 and 2Q17 respectively. 

The VARD 3 05 vessel will be larger with higher specs. It will measure 151m in length and 30m in breadth, and will carry pipelay towers rated at 650 tonnes. The Brazilian-built VARD 3 05 vessel will measure 139.9m in length and 28m in breadth, and will have 340-tonne capacity.

What We Think
Vard has clinched NOK10.5bn of orders YTD, meeting our target of NOK11bn for the year. We now raise our target to NOK14bn. Owing to fierce competition, we believe margins for the four vessels could be on the lower side, though not diluting the group?s blended profitability too much. We retain our EBITDA-margin expectations of 8% for FY14 and 9% for FY15.

Vard has a longstanding relationship with DOF-Technip and is the first and only yard to have successfully delivered two Brazilian-built PLSVs. We think the win demonstrates that Norwegian yards still have a competitive edge in high-end offshore production. Given its recent execution hiccups in Brazil, we are also comforted that the Brazilian-built vessels will have a longer delivery lead time.

What You Should Do
Stay Neutral on a 12-month horizon. We would revisit the stock on stronger orders and earnings. (Read Report)
 
 
warrenbegger
    12-Aug-2013 11:58  
Contact    Quote!


Those like to talk rubbish one where r they now?

They only know how to talk rubbish and after that hide and change nick again  when they r wrong...

-Grazt to those that vest at low bottom, cheers :)
 
 
eaton1977
    12-Aug-2013 11:55  
Contact    Quote!
Need another 1billion usd contract to push up the price

rabbitfoot      ( Date: 12-Aug-2013 11:42) Posted:

Should be by end 2013 and not 2014. And that's Double confirm :)

rabbitfoot      ( Date: 12-Aug-2013 11:39) Posted:

Mgnt confirmed 12 to 14 bil nok by end 2014. So far 10 bil nok order. Another 4 bil in 4.5 months time. That interview report by Kim eng just beside my pillow


 

 
rabbitfoot
    12-Aug-2013 11:42  
Contact    Quote!
Should be by end 2013 and not 2014. And that's Double confirm :)

rabbitfoot      ( Date: 12-Aug-2013 11:39) Posted:

Mgnt confirmed 12 to 14 bil nok by end 2014. So far 10 bil nok order. Another 4 bil in 4.5 months time. That interview report by Kim eng just beside my pillow

 
 
rabbitfoot
    12-Aug-2013 11:39  
Contact    Quote!
Mgnt confirmed 12 to 14 bil nok by end 2014. So far 10 bil nok order. Another 4 bil in 4.5 months time. That interview report by Kim eng just beside my pillow
 
 
eaton1977
    12-Aug-2013 11:38  
Contact    Quote!
Hold this baby till 1.22 and above

WanSiTong      ( Date: 12-Aug-2013 11:36) Posted:



GreatWall break!

Last done 0.865 Huat ah!

eaton1977      ( Date: 12-Aug-2013 10:55) Posted:

Big wall at 86


 
 
WanSiTong
    12-Aug-2013 11:36  
Contact    Quote!


GreatWall break!

Last done 0.865 Huat ah!

eaton1977      ( Date: 12-Aug-2013 10:55) Posted:

Big wall at 86

 
 
WanSiTong
    12-Aug-2013 10:57  
Contact    Quote!
Hope it can be cleared! Huat ah!

eaton1977      ( Date: 12-Aug-2013 10:55) Posted:

Big wall at 86

 
Important: Please read our Terms and Conditions and Privacy Policy .